Birse Civils instructed TMS to install 101 meters of AZ section piles. The piles were 17.5M in length and weighed just over 5 tonnes each. The piles were installed using conventional piling gates and a combination of vibration and drop hammers. The piles were driven to the ground level to allow stone to be placed over them.