27 May 2011

Burringham Bank Stabilisation (2nd phase)

Birse Civils instructed TMS to lay approx 2000 tonnes of rock armour on the embankment.  The stone was laid using a 35 tonne long reach excavator sat on deck of the TMS Maverick Crane Barge. The stone was loaded into a hopper barge with a crane and grab on a quayside.  It was then transported from the quay to the Maverick and unloaded by crane onto the embankment.